1. Quantity surveying mainly deals with:





2. The primary purpose of estimation is to:





3. Which type of estimate is prepared at the initial planning stage?





4. Detailed estimate is based on:





5. Which document lists item descriptions, quantities, rates, and total costs?





6. Contingency charges in an estimate are provided for:





7. The unit of measurement for brickwork is:





8. Which type of estimate is prepared when there are major changes in design?





9. The term “prime cost” refers to:





10. Work charged establishment includes:





11. The deduction in brickwork is NOT made for:





12. Which type of contract includes a fixed price for all work?





13. Analysis of rates includes:





14. Salvage value refers to:





15. The lead statement in estimation provides:





16. The unit of measurement for plastering is:





17. Overhead costs in estimation include:





18. Scrap value is:





19. Which estimate is prepared to determine the financial feasibility of a project?





20. Sinking fund is used for:





21. Which is NOT a method of approximate estimating?





22. The quantity of cement in 1:6 brick masonry per m³ is approximately:





23. Which item is measured in running meters?





24. BOQ stands for:





25. The purpose of a bar bending schedule (BBS) is:





26. Which estimate is prepared after the completion of work?





27. Depreciation is:





28. The typical percentage of contingency charges in a government project is:





29. Earthwork in road embankment is measured in:





30. The schedule of rates (SOR) is prepared by:





31. Which factor does NOT affect the rate analysis?





32. The life of a building is assumed to be:





33. The unit of measurement for painting is:





34. Which is NOT included in preliminary estimate?





35. An estimate including new work in addition to original is called:





36. The thumb rule for cement in 1 m³ of RCC (1:2:4) is:





37. Contractor’s profit is generally taken as:





38. Which type of cost includes depreciation, interest, and insurance?





39. The plinth area is measured at:





40. Which is NOT a type of estimate used in civil works?





41. Which factor is used for converting dry volume to wet volume of concrete?





42. In road work, prime coat is estimated in:





43. What is the purpose of a tender?





44. Star rates are used when:





45. The unit of measurement for steel reinforcement is:





46. The purpose of a preliminary estimate is:





47. A daywork schedule is related to:





48. Which is NOT considered in depreciation calculation?





49. Measurement book (MB) is used for:





50. Which is an indirect cost in construction?





1. Basic/Foundation Subjects

2. Core Civil Engineering Subjects

3. Advanced/Applied Subjects

4. Management and Planning

5. Environmental & Sustainable Development