Construction Planning and Management (Practice Test MCQs)

50 Score: 0 Attempted: 0/50 Subscribe
1. The main objective of construction planning is:





2. CPM stands for:





3. Which of the following focuses on both time and cost optimization?





4. The most uncertain factor in PERT analysis is:





5. Which chart is commonly used for short-term scheduling?





6. Dummy activities are used in network diagrams to:





7. The free float of an activity is:





8. In PERT, expected time is calculated using:





9. Slack in a project network is:





10. The project milestone indicates:





11. Which method is best for repetitive construction projects?





12. The S-curve in construction management represents:





13. Which is NOT a component of construction planning?





14. Work breakdown structure (WBS) helps in:





15. The primary difference between CPM and PERT is:





16. Resource leveling aims to:





17. Fast tracking in project scheduling means:





18. Crashing a project means:





19. Earned Value Management (EVM) measures:





20. The term BOQ stands for:





21. Which one is NOT a project constraint?





22. A project is considered over budget if:

24. The project life cycle does NOT include:





25. Which one is NOT a type of project procurement method?





26. Time-cost optimization is also called:





27. Float in CPM network is generally measured in:





28. Which document outlines project scope, objectives, and key stakeholders?





29. The term “mobilization advance” in contracts refers to:





30. The main purpose of site layout planning is:





31. The risk register contains:





32. Which technique is used to analyze cause-and-effect relationships in quality management?





33. A punch list is prepared:





34. Retention money is:





35. The “critical path” in a network is the path:





36. In project management, a baseline refers to:





37. Which one is NOT a resource in construction?





38. A procurement schedule is used to:





39. Contingency reserve is kept for:





40. Which is NOT part of construction project closing?





41. Quality assurance (QA) focuses on:





42. Which contract type has the highest financial risk for the contractor?





43. In earned value analysis, Schedule Performance Index (SPI) is calculated as:





44. If Cost Performance Index (CPI) = 1.2, it indicates:





45. What is the main purpose of risk management in construction?





46. The term “float consumption” means:





47. Safety management in construction is governed by:





48. The purpose of a kick-off meeting is:





49. Value engineering is aimed at:





50. Which is the last step in project management?