Water Resources Engineering (Practice Test MCQs)

50 Score: 0 Attempted: 0/50 Subscribe
1. The main objective of water resources engineering is:





2. The hydrologic cycle involves:





3. The unit of rainfall measurement is:





4. The main purpose of a dam is:





5. The term “catchment area” refers to:





6. The main purpose of a spillway in a dam is:





7. The unit of discharge is:





8. The main advantage of canal irrigation is:





9. Which is an example of a diversion headwork?





10. The duty of water refers to:





11. Delta in irrigation refers to:





12. The best type of dam for narrow gorges is:





13. The main purpose of sluice gates in dams is:





14. The term “hydrograph” represents:





15. The main advantage of underground water storage is:





16. The process of artificially replenishing groundwater is called:





17. The optimum moisture content for crop growth is called:





18. A gravity dam resists the external forces mainly by:





19. The main purpose of a stilling basin is:





20. The most suitable soil for earthen dams is:





21. Flood routing is used to:





22. The storage capacity between minimum pool level and full reservoir level is called:





23. The term “freeboard” in a dam refers to:





24. The type of canal used to connect two reservoirs is called:





25. The best method of irrigation for water-saving is:





26. The unit of permeability is:





27. The process of removal of silt from canals is called:





28. The main purpose of a barrage is:





29. The depth of water required to mature a crop is known as:





30. The formula for runoff estimation in hydrology is often based on:





31. The main purpose of canal lining is:





32. The term “command area” in irrigation means:





33. The main force acting on a gravity dam is:





34. The most suitable type of spillway for earthen dams is:





35. The term “hydraulic jump” occurs when:





36. The main cause of waterlogging is:





37. A cross drainage work is constructed to:





38. The term “base period” in irrigation refers to:





39. A check dam is constructed mainly to:





40. The type of irrigation which uses perforated pipes is:





41. The term “silt factor” is used in:





42. Which of the following is a non-perennial river?





43. The main purpose of a guide bank in a river is:





44. The process of converting saline water into freshwater is called:





45. Which is the most suitable method for irrigation of fruit orchards?





46. The main source of groundwater recharge is:





47. The water that drains quickly and is unavailable to plants is called:





48. The major function of a head regulator is:





49. The main advantage of tube wells over open wells is:





50. Which is the most important parameter for designing a hydropower plant?





1. Basic/Foundation Subjects

2. Core Civil Engineering Subjects

3. Advanced/Applied Subjects

4. Management and Planning

5. Environmental & Sustainable Development